MTTJ Mold-Tech logo

Design & Materials

Wire Harness Design Input Checklist

A good harness input package shows the route, branches, connectors, terminals, labels, protection, wiring table, tests, and packing notes in one place. Missing branch or terminal data is what most often slows a harness RFQ.

Published: Updated:

Decision summary

What to carry into the decision

  • Control branch datums, connector orientation, wire identification, protection, and tie points in one layout.
  • Link every circuit to the BOM and wiring table used for electrical checking.
  • Show installed routing, service movement, and keep-out areas when they affect branch length or strain relief.
In this guide
  1. 1Direct answer
  2. 2Core checklist
  3. 3When a sample is the starting point
  4. 4Pair photos with build documents
  5. 5Harness drawing control table
  6. 6Common layout ambiguities

Use the sections in sequence, then turn the open items into one controlled build or sourcing package.

Direct answer

Send the harness drawing, BOM, connector and terminal list, branch dimensions, label requirements, routing protection, wiring table, and test method before requesting a build quote.

If a drawing is preliminary, mark each open item and identify which details are fixed for the sample quote.

Core checklist

Use this list before sending a new harness RFQ.

  • Harness drawing with branch length, connector orientation, tie points, bend areas, and tolerance notes.
  • BOM with wire type, gauge, color, terminal, housing, seal, sleeve, heat shrink, tape, and label items.
  • Wiring table or pinout with circuit identification, shield termination, grounding, and polarity notes.
  • Test method, fixture requirement, pass/fail limits, inspection criteria, packing, and records.

When a sample is the starting point

Marked photos can help identify measured points, connector orientation, and cable exit details. For repeat production, pair the sample with terminal data, wire type, and test criteria.

Pair photos with build documents

Harness layout photos can mark routing, branch dimensions, connector positions, and inspection points. Pair them with the drawing, BOM, wiring table, and test criteria used for quotation and repeat production.

Harness drawing control table

Relate each visible feature to the source that controls it.

ElectricalCircuit ID, from-to connection, pinout, wire size, color or marking, and test expectation.
MechanicalBranch length, breakout datum, connector orientation, bend area, and keep-out zone.
ProtectionSleeving, conduit, tape, heat-shrink, grommet, seal, and transition limits.
IdentificationConnector, branch, circuit, warning, and package labels with location and format.

Common layout ambiguities

Avoid chain dimensions without a governing datum, connector views without mating orientation, labels without location, and protection notes without start and stop points. Mark sample photos when a drawing view cannot show an installed route clearly.

Harness layout

Routing, branches, and identification

Compare the visible branch paths, tie points, protection, labels, and connector positions with the datums shown in your layout.

Stamped metal terminals attached to a carrier strip on a light surface
Stamped terminal stripThe specified terminal and carrier format should be paired with wire gauge, strip length, crimp data, pull-force criteria, and visual inspection needs.

Practical questions

Questions this guide answers

Which harness dimensions need clear datums?

Overall path, each branch, breakout position, connector orientation, exposed wire, label location, sleeve or tube limits, and tie points should be measured from defined references.

When is a harness board useful?

A board or layout fixture can help repeat branch routing and connector positions when the drawing identifies the same datums and inspection points used on the board.

How should spare or optional circuits be shown?

Identify them in the wiring table and BOM, including termination, insulation, parking, label, test, and configuration rules. Do not leave unused conductors to shop interpretation.

Continue the review

Related resources and manufacturing scope

Request a quote

Send the harness layout and wiring package

Include the controlled drawing, BOM, and wiring table. Add the connector and terminal data with branch dimensions. Define labels, protection, and tests. State the quantity and packing.

Start an RFQ