A second-source transfer starts with the current drawing, reference sample, BOM, test method, and any parts that may not be substituted. MTTJ uses that controlled package to compare the proposed build with the existing cable assembly or wire harness.

For a cable assembly moving to another supplier

  • You have an existing assembly, drawing, reference sample, or supplier package
  • A second manufacturing source is needed for risk control or supply continuity
  • The project requires careful comparison against the current build and test expectations
  • Materials, connectors, or documents must stay unchanged unless your team approves a change

Start with current drawing, BOM, sample, test criteria

  • Current drawing, reference sample, or supplier specification
  • Existing BOM, connector list, wire or cable requirements, and inspection criteria
  • Quantity, annual demand, sample plan, no-substitution items, records, and delivery destination

Transfer control

No-substitution parts and accepted differences

  • Drawing-to-sample consistency
  • Connector, terminal, wire, cable, label, and packaging equivalency
  • Testing and inspection criteria from the existing supplier package

Samples and records

Reference samples, inspection records, change evidence

  • Current sample photos and marked differences if known
  • Existing inspection records or test criteria
  • Specified component list, no-substitution notes, label, packing, and shipment record expectations

Continue the review

Related resources and manufacturing scope

Transfer quotation

Use the current build as the comparison point

Separate current build requirements from requested improvements
Identify components that cannot be substituted
Provide existing test criteria, record format, and sample needs

FAQ

Second-source transfer

Can MTTJ copy an existing assembly from a sample?

A sample helps reveal construction details, while drawings, material requirements, connector details, and test criteria keep the transfer repeatable.

How should substitutions be handled?

Any material, connector, or process substitution should be documented and accepted by your team before production handoff.

Request a quote

Send the transfer package

Include the current drawing, BOM, reference sample, test criteria, no-substitution parts, and any accepted change.